Completed Construction Projects

Overview: 

The District replaced scoreboards at Estancia High School Jim Scott Stadium & Costa Mesa High School Baseball and installed a new scoreboard at Corona Del Mar Softball Field.

Documents:

N/A

SCHOOL HVAC NOTES
California Yes Completed Summer 2015
TeWinkle Yes Completed Summer 2015
Killybrooke Yes Completed Summer 2015
Early College HS Yes Completed as part of modernization in 2016
Paularino Yes Completed Summer 2016
Sonora Yes Completed Summer 2016
Adams Yes Completed Summer 2016
Victoria Yes Had HVAC prior to projects
Rea Yes Had HVAC prior to projects
Eastbluff Yes Had HVAC prior to projects
Andersen Yes Had HVAC prior to projects
Lincoln Yes Had HVAC prior to projects
Newport Coast Yes Had HVAC prior to projects
Estancia HS Yes Had HVAC prior to projects
Corona del Mar MS/HS Yes Completed Summer 2020
Davis Magnet Yes Completed Summer 2018
College Park Yes Completed Summer 2018
Wilson Yes Completed Summer 2018
Pomona Yes Completed Summer 2018
Kaiser Yes Completed Summer 2018
Woodland Yes Completed Summer 2018
Whittier Yes Completed Summer 2019
Mariners Yes Completed Summer 2019
Newport Heights Yes Completed Summer 2019
Ensign Yes Completed Summer 2019
Newport El Yes Completed Summer 2019
Harbor View Yes Completed Summer 2019
Back Bay HS Yes Completed Summer 2019
Costa Mesa MS/HS Yes Completed Summer 2020
Newport Harbor HS Yes Completed Summer 2020

 

 

CdM Security Fence Project Picture

Overview:

The project consists of replacement of the existing six-foot chain-link along Mar Vista Drive and Vista Del Oro with a new, permanent eight-foot chain-link fence. Trees along this section will also be removed, however they will be replaced upon completion of construction. 

Additional enhancements include:

  • Installation of permanent fencing along the perimeter of the school. 

    • Some sections will continue to be chain link fencing, while other sections (front entrance to the high school, student parking lot - adjacent to the pool and Learning Resource Center (LRC), and parts of the fencing near the baseball field/middle school entrance) will have ornamental fencing. 

  • Construction of new sidewalks throughout the campus to allow for pedestrian traffic within the interior and exterior of fence perimeter. 

  • Reconfiguration of the school bus pick-up/drop-off along Mar Vista Drive to allow construction of additional sidewalks.

  • Reconfiguration of the student parking lot near the pool and LRC for accessibility enhancements.

  • Construction of a new entry structure at the athletic entrance adjacent to the pool and LRC.

Documents:

Drone view courts

Progress Picture: 1/28/21

Overview: 

Replacement of tennis court chain link fencing, including posts, footings and chain link mesh. New gates and concrete walkways, where necessary, for access. Resurfacing and re-striping improvements as well as relocation of electrical to underground distribution.

 

Ensign Rendering

Ensign Fence Project Picture

Overview:

The project includes a variety of construction upgrades, including:

  • Replacement of temporary fencing with permanent fencing
  • Reconfiguration of existing parking lot
  • Construction of an additional parking lot along Irvine Avenue to accommodate approximately 45 parking spaces. 
  • Construction of a new pick-up/drop-off lot at the front of the school. The front lot, as some have called the “banana lot”, includes a one-way drop-off/pick-up lane which minimizes traffic congestion on City streets, and approximately 20 parking spaces.
  • Remodel of the front office to improve visibility and access. 

As part of the project, several trees will be removed to accommodate construction, additional trees will be planted throughout the school.

Documents:

Overview:

Replacement of single lane batting cage with new two lane batting cage. Batting cage will be chain link with interior sports netting to match the batting cages at other District schools.

Newport Harbor Batting Cage

 

Overview:

The parking lot will be reconfigured to improve pedestrian safety, add parking stalls, and beautify the front of campus at Newport Heights Elementary School.Newport Heights Parking Lot

 

  • Corona del Mar – Baseball Backstop
  • Corona del Mar – Enclave
  • Corona del Mar – Front Entry
  • Corona del Mar – Learning Resource Center
  • Corona del Mar – Locker Resotation
  • Corona del Mar – Marian Bergeson Aquatic Center
  • Corona del Mar – Theater
  • Corona del Mar – Weight Room
  • Costa Mesa High School – Aquatic Center
  • Costa Mesa High School – Clock Tower
  • Costa Mesa High School – Enclave
  • Costa Mesa High School – Enclave Lunch Area
  • Costa Mesa High School – Gym Renovation
  • Costa Mesa High School – Mustangs Field
  • Costa Mesa High School – Project Lead the Way
  • Costa Mesa High School – Softball Scoreboard & Batting Cage
  • Costa Mesa High School – Theater
  • Estancia High School - Aquatics Center
  • Estancia High School – Classroom Storefront
  • Estancia High School – Jim Scott Stadium
  • Estancia High School - Security Fencing
  • Mariner Elementary – Administration Office Fence
  • Newport Harbor High School – Davidson Field
  • Newport Harbor High School – Gym
  • Newport Harbor High School – Robin Loats
  • Newport Harbor High School – Softball Scoreboard
  • Newport Heights Elementary – Administration Office Fence
  • TeWinkle Intermediate – Gym
  • Wilson Elementary - Administration Office Fence

Contact Us

Ara K. Zareczny, LEED AP
Administrative Director II, Facilities Development, Planning and Design
azareczny@nmusd.us
714-424-7522

Lori Horrell
Administrative Assistant II
lhorrell@nmusd.us
714-424-8934

Steve Morris
Facilities Planning Coordinator
District Project Inspector 
DSA #5981
smorris@nmusd.us
714-424-7568

Jaime Vejar, Jr.
Facilities Analyst
 jvejar@nmusd.us
714-424-7567